From plotto possession.
Six stages, each with clear deliverables, quality checks and a payment milestone. You always know what is happening, what comes next and what it costs.
Consultation & site visit
We meet at your plot, take measurements, check road and drain levels, note neighbouring buildings and discuss your needs, budget and timeline.
You receive
- Site measurement sketch
- Initial scope and budget range
- Soil test recommendation
Planning & 3D design
Vastu-aware floor plans and elevation options, developed into photoreal 3D renders. We revise until you are happy with how the home will look and work.
You receive
- Floor plans for every level
- 3D elevation, day and evening
- Interior concept renders (if in scope)
BOQ, agreement & approvals
Structural design and working drawings are prepared, and every item is priced in an itemised BOQ. We sign a clear agreement and support the sanction submission.
You receive
- Structural and working drawings
- Itemised BOQ with brands
- Agreement with schedule and milestones
Structure
Excavation, footings, plinth, columns, beams and slabs. Reinforcement is inspected before every pour, and concrete is sampled for cube tests.
Quality checks
- Rebar spacing and cover before pour
- Slump test on site, cube test at 7 and 28 days
- Curing log for every slab
Masonry, services & finishes
Walls, concealed plumbing and wiring, plaster, waterproofing, flooring, doors, windows, paint and elevation work, followed by interiors if included.
Quality checks
- Plumbing pressure test before tiling
- 48-hour ponding test on terraces
- Insulation test on electrical circuits
Snagging & handover
We walk the home with you, list every snag, fix it, deep-clean the house and hand over the keys with all the documents you need.
You receive
- As-built electrical and plumbing drawings
- Warranty cards and manuals
- Maintenance guide
Pay as the work is done.
Payments are linked to completed, inspected stages, never to dates alone. A typical schedule for a new home is shown here; your agreement sets the exact percentages.
| Milestone | When it is due | Share |
|---|---|---|
| Booking | On signing the agreement | 5% |
| Drawings sign-off | Structural and working drawings approved | 5% |
| Foundation & plinth | Plinth beam cast | 15% |
| Slabs | Split across each roof slab cast | 30% |
| Masonry | Brickwork complete on all floors | 10% |
| Plaster & services | Internal and external plaster, concealed MEP | 10% |
| Flooring & fixtures | Flooring, doors and windows fixed | 10% |
| Paint & elevation | Painting and façade work complete | 10% |
| Handover | After snag list is closed | 5% |